See what Dust Suppression Plus is worth across your haul network in water, grader hours, water-cart hours, haul fuel and dust. Every result shows the before and after figures and how they're calculated, ready to put in front of your team.
Enter what the network uses today. Twelve months of site records give the strongest business case.
Pre-filled with results Envirofluid has achieved on mining haul roads. If you've run a trial, enter your own results.
Before and after for each area, and how each figure is calculated.
Year 1 includes the establishment and build phases, which use higher doses. From year 2 it's a 1% maintenance dose. The product goes through your existing water carts, with no new equipment.
| Year 1 | Year 2 onward |
|---|
| Phase | Dose | Product |
|---|
Run treated sections beside an untreated section on the same road, material and traffic, and track:
| Measure | Source |
|---|---|
| Water use | Cart fill logs, as kL per km per day |
| Water-cart hours | Fleet management system |
| Grader hours | Fleet management system |
| Haul truck fuel | Fleet management system, as L per tonne-km |
| Dust | PM10 from site or mobile dust monitors |
| Visibility | Dust-related speed restrictions, stoppages and operator reports |
| Road condition | Rut depth, corrugation and defect ratings |
Every figure, formula and assumption above as a printable report for your team. We'll also send pricing for the product volume your network needs.