Envirofluid

Triple7 · Site Operations Tool

5-day dust risk forecast — for any Australian site

Combines BOM/ECMWF wind, rainfall and evapotranspiration data into a Dust Risk Index, with a Triple7 pre-treatment plan ready to action when conditions warrant.

Forecast data via Open-Meteo · ECMWF + BOM ACCESS-G · Last reviewed May 2026
Peak Risk · 5-Day Outlook
Peak Gust (km/h)
Surface Deficit (mm)
Rain Forecast (mm)

5-Day Outlook

Surface Conditions · Last 7 Days

Reference only Dust Risk Index = wind × surface_dryness × (1 − rainfall_suppression). Calibrated for haul-road and open-area conditions; thresholds tune to your site's PM10 history once connected. Forecast data: ECMWF / BOM ACCESS-G via Open-Meteo.
Safer · Cleaner · Greener

Want a Triple7 specialist to assess your site?

We've done dust suppression on a hundred Pilbara haul roads. Show us your site and a specialist will come back within one business day with a tailored treatment plan — Triple7 product, dose, application timing, and water-savings estimate against your current approach.